What Our Clients are Saying

Our company worked with Panel Masters on the Intermountain Trailer project in Fort Lupton, Colorado. The project consisted of a 34,886 SF manufacturing facility with a large over lot. Panel Masters and CCI worked closely to coordinate exterior canopy locations. Panel Masters completed their scope in October, 2023.

CCI contracted Panel Masters to complete the building concrete scope on said project. They completed their scope of work successfully. Moreover, their work was completed safely, on schedule, on budget, and of the highest quality.

CCI found Panel Masters' performance throughout the project more than satisfactory. Panel Masters' management, from the highest level down to the onsite supervisor, showed care and professionalism throughout the project.

CCI recommends Panel Masters for any project that requires tilt-up construction

Brandon Goodell, Senior Project Manager
Construction Concepts, Inc (April 2024)

Our company worked with Panel Masters on the PFG project in Commerce City, Colorado. The project consisted of a 265,416 SF industrial building. Panel Masters completed their scope in October, 2023. ARCO National Construction contracted Panel Masters to complete the tilt-up panels and cast-in-place foundation scope on said project. They completed their scope of work successfully. Moreover, their work was completed safely, on schedule, on budget, and of the highest quality. 

ARCO National Construction found Panel Masters' performance throughout the project more than satisfactory. Panel Masters' management, from the highest level down to the onsite supervisor, showed care and professionalism throughout the project.  ARCO National Construction recommends Panel Masters for any project that requires tilt-up construction. 

— Chris Patterson, Director of Operations
Arco National Construction (January 2024)

Our company worked with Panel Masters on the W. 65th Drive project in Arvada, Colorado. The project consisted of a 35,030 SF mixed-use building with a multiple-layer storefront system and abundant formliner. There was also a last-minute ADA design change, for which Panel Masters worked closely with Center Land Properties to mitigate the cost, time, and architectural impact. Panel Masters completed their scope in March 2023.

Center Land Properties contracted Panel Masters to complete the tilt-up panels and cast-in-place foundation scope on said project. They completed their scope of work successfully. Moreover, their work was completed safely, on schedule, on budget, and of the highest quality.

Center Land Properties found Panel Masters' performance throughout the project more than satisfactory. Panel Masters' management, from the highest level down to the onsite supervisor, showed care and professionalism throughout the project. Center Land Properties recommends Panel Masters for any project that requires tilt-up construction.

— Kenny Lombardi, Vice President
Center Land Properties, Inc. (December 2023)

dcb Construction Company, Inc. contracted with Panel Masters to provide labor and materials to construct tilt-up panels and cast-in place foundations on the Mountain West Business Center Building 6-8 project in Littleton, Colorado. The project consisted of a 49,430 SF mixed use building with numerous exterior feature panels laminated against the interior structural panels, and a precast twin-T roof. Panel Masters completed their scope in April 2023.

Panel Masters completed their scope of work successfully. Moreover, their work was completed safely, on schedule, on budget, and of the highest quality. dcb found Panel Masters' performance throughout the project more than satisfactory. Panel Masters' management, from the highest level down to the onsite supervisor, showed care and professionalism throughout the project.

— Karen Poole, Sr. Project Manager
dcb Construction Company (December 2023)